Photo Gallery of new Studio building, November 2006- Jan 2007

Jan 5th 2007 - finished!

 

December 2006

 

November 2006

 


14.11 the main window, soon to be reglazed. The roof is being changed altogether for a glass one. Door into the house

 

 


14/11 Two new solid doors.

 


14/11 From the back of the booth, showing the roof area with half-loft area

 


14/11 from inside the booth, looking at the door into the control room, and the alcove with the window



13 November, hole cut through for window into booth

August 2006